
Most smart buildings fail to reach their potential because the technical logic is lost in the noise of construction delivery. When the integration “logic” is buried as a sub-package of the mechanical or electrical works, the owner-operator pays the price through decades of operational friction.
Join a cross-disciplinary panel moderated by One Sightsolutions, featuring owner-operators, design, build, and operations teams, to explore the emergence of the master systems coordinator (MSC). We will discuss why the industry must shift to a design for performance management model – separating logic from labour to ensure that the AEC team delivers a building that is operationally ready on day 1. Discover how the MSC acts as the vital bridge, partnering with commissioning to ensure the “digital handshake” is a catalyst for successful soft landings and AI-driven smart FM.
Date: 4th June 2026
Time: 12:00 - 12:30
Digital Operations Stage